About · Dongguan Anchi Metal Hardware
A hardware source factory since 2008
A 15,000 m² plant in Humen, Dongguan, with 500+ staff and more than eighteen years of gift R&D and manufacturing behind it. Every step — from tooling to packing — happens on site.
Built on one production floor
The team includes six 3D designers, ten CNC engraving machines and eleven fifth-generation die-casting machines. Eight fully automatic polishing machines keep tooling and sampling down to 7–14 days.
The colour-printing workshop runs five high-speed UV printers with eight-colour recognition, so finished colours stay close to the design file. Eighteen automatic epoxy machines handle orders above 100,000 pieces.
Packing runs on ten-plus automatic lines with 300+ packing staff, and every part passes three QC checks from component to finished product. Anchi holds ISO 9001 and Sedex4P certification and works with long-term partners among international luxury and cultural-institution clients.

Dongguan Anchi Metal Hardware Co., Ltd. · No. 1 Hongye South Road, Xinwan, Humen, Dongguan, Guangdong, China
Plant and equipment
What sits inside 15,000 m²
6
3D designers
10
CNC engraving machines
11
Fifth-generation die-casting machines
8
Automatic polishing machines
5
High-speed UV printers
18
Automatic epoxy machines
10
Automatic rhinestone-setting machines
10+
Automatic packing lines
300+
Packing staff
Our journey
From one workshop to a single-site plant
- 2008
Founded in Humen, Dongguan
A full-chain hardware source factory, from design and tooling to packing.
- 2020
Category development for brands
Solid perfume becomes a core line, with the focus moving to gift customisation for international brands.
- 2021
Car and candle fragrance lines
Zinc-alloy car fragrance and candle lids open overseas markets; online custom and retail platforms launch.
- 2022
Standardisation
Stronger standards across categories and active support for emerging designer brands.
- 2025
A dedicated 15,000 m² plant
Moved into a single-site plant to serve clients better, with further certifications completed.



Salt spray test
Plating corrosion resistance verified in-house before release.
Salt spray chamber
Finished parts exposed and inspected cycle by cycle.
Tensile test
Pull strength checked on hooks, rings and assemblies.
5 steps from first enquiry to delivery — starting with one email.
Contact details